- Push Button Switches[5]
- Other Electrical Equipment[6]
- Temperature Instruments[10]
- Instrumentation Cables[1]
- Electrical Wires[1]
- Power Distribution Equipment[10]
- Metal Building Materials[3]
- Electrical Plugs & Sockets[10]
- Circuit Breakers[10]
- Flow Meters[10]
- Other Measuring & Analysing Instruments[1]
- Current Meters[1]
- Car Black Box[1]
- Other Electronic Measuring Instruments[2]
- Connectors[7]
- Pipe Fittings[3]
- Other Switches[10]
- Voltage Regulators/Stabilizers[7]
- Integrated Circuits[2]
- Inverters & Converters[3]
- Other Lights & Lighting Products[2]
- Relays[10]
- Counters[5]
- Timers[2]
- Acoustic Components[4]
- Sensors[1]
- Electric Heater Parts[1]
- Limit Switches[1]
- Pressure Transmitters[4]
- Testing Equipment[1]
- Contact Person : Mr. Yuan longzhu
- Company Name : Qingdao Sico Electric Equipment Co., Ltd.
- Tel : 86-532-83028251
- Fax : 86-532-83028251
- Address : Shandong,Qingdao,No.20 Renmin Road Qingdao China
- Country/Region : China
XL21 Power Distribution Cabinet/ power control cabinet
XL21 Power Distribution Cabinet
XL 21 Power Distribution Cabinet, indoor enclosed power distribution Cabinet, cabinet structure using thin plate bending welding or bolt assembled, with upper and lower ventilation window, inlet& outlet cables introduced by the bottom. If users have special requirements, incoming line knock-off holes also can be opened on the top of the cover or adding bus. Shell protection grade not less than IP30, technology performance conform to GB7251.1 standards.
Suitable for indoors under normal conditions of use, rated insulation voltage 660v, rated voltage is AC 380V, rated current of rated frequency 50hz to 630A and distribution systems as in industrial and mining enterprises, residential, offices, public buildings and other places used for power, lighting and power distribution
Usage Environment
Altitude not exceeds 2000 meters.Ambient temperature: ambient air temperature is not higher than +40 °C.No excessive dust, acid, salt, corrosive and explosive gases in the air. Relative humidity does not exceed the maximum temperature of +40 °C 50% at the lowest temperatures, allowing a higher temperature may accidentally produce general condensation
Structure
Fixed structure of the power distribution cabinet outline and mounting dimensions are shown in Table
Modular power distribution cabinet shape and installation dimensions same as fixed structure
Accessories
Accessories: Power distribution cabinet with packing lists, product certification, product specifications and drawings, door key and the supply of spare parts
Installation and maintenance
Power distribution cabinet is allowed packing & transportation only after strictly quality inspection. When the products arrived at destination, firstly to check the packing slip is complete. If power distribution box is not to install immediately, please be stored in a dry & clean place.
Please note installation in strict accordance with the installation diagram. Channel steels and screws are prepared by user-self; In the case of the cable outlet, user need to burying the basic groove and foot bolts and then to open cable trench.
After installation or maintenance, power distribution Cabinet Group must be carried out the following items of inspection and testing before put into operation:
Checks whether the internal electrical equipment and wiring in line with original blueprint.
Check and operating the switch several times, to see if flexible & normal
Check and test all the instruments and relay if operations are accurate
Power distribution cabinet is allowed packing & transportation only after strictly quality inspection. When the products arrived at destination, firstly to check the packing slip is complete. If power distribution box is not to install immediately, please be stored in a dry & clean place.
Please note installation in strict accordance with the installation diagram. Channel steels and screws are prepared by user-self; In the case of the cable outlet, user need to burying the basic groove and foot bolts and then to open cable trench.
After installation or maintenance, power distribution Cabinet Group must be carried out the following items of inspection and testing before put into operation:
Checks whether the internal electrical equipment and wiring in line with original blueprint.
Check and operating the switch several times, to see if flexible & normal
Check and test all the instruments and relay if operations are accurate
All this kind Electric Cabinet, we promise will offer the best price by the good quality in china!We also accept special order about the products. If you are interested in our products. Please do not hesitate to let us know.We are pleased to give you the detailed information.We promise all the products we supply are high quality and best price.We are sincerely looking for your cooperation. Please contact Ms.Amy YIN --- yinamy9@gmail [dot] com and sikeqd@126 [dot] com
XL21 Power Distribution Cabinet/ power control cabinet